Sl.No Project Description
1 Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Design Ch. Km 144+900 Near Hemmige village/ SH-21 Hassan - Periyapatna Road Junction to Design Ch. Km 169+000 at Near SH - 86 Ramanathapura - Terakanambi Road/ KR Nagar Junction in Hunsur in the state of Karnataka (Package-III) for NHAI.
2 “Multi Village Water Supply Scheme to Santhemuddapura & other 164 Habitations in Jagalur Taluk, Bathi, Hebbal & other 18 Habitations in Davangere Taluk and Bulk Water Supply to Kondajji & other 10 Habitations in Harihara Taluk of Davangere District under Jal Jeevan Mission” for RWSSD.
3 Proposed Construction Of General Hospital Building & Staff Quarters Building On Plot Bearing CTS No. 11 A/4, Of Village Chandivali, Sangharsh Nagar, Kurla for MCGM.
4 Development of Dedicated Jetty For Lakshadweep With Allied Infrastructure Facilities For Cargo And Cruise Terminal At Old Mangalore Port” for IDD.
5 Formation of Sites and Construction of Roads, Road side drains, Cross Drainage Works, Storm Water Drains, Rain Water Harvesting, Protection Works including Utilities (Water Supply, UGD and Electrical Works) Development for Sector-8 of Dr K. Shivarama Karantha Layout, Bengaluru for BDA.
6 Construction of Judicial Housing Complex at Mazgaon, Mumbai. (4 Level Podium Parking with 34 storey High Rise 2 Building of Type V and VI for PWR.
7 Proposed Phase wise Redevelopment of Management Development Centre at Borivali (W), Mumbai for LIC.
8 KIIFB-KIIDC Project Construction of Groin Fields in The Severely Eroded Coastal Belt of Alappuzha District at Ottamassery, Kattoor-Pollethai, Kakkazham (Ambalappuzha) And Nellanickal (Vattachal)”.
9 Construction of 1410 tenements using Pre-Fabricated Concrete Technology on Lump-Sum Turnkey Design & Build basis including all services such as Internal and External water supply, sanitary, electrification and development works at i) Periyar Nagar scheme Zone – VI, ii) Navalar Nedunchezhiyan Nagar and Chindadripet scheme Zone – V and iii) B.R.N Garden scheme Zone - V under HFA - PMAY (AHP) fro TNUHDB.
10 Construction of 1526 tenements using Pre-Fabricated Concrete Technology on Lump-Sum Turnkey Design & Build basis including all services such as Internal and External water supply, sanitary, electrification and development works at i) Andimaniyam Thottam scheme Zone – IX, ii) Gandhi Nagar scheme Zone - VIII and iii) Goyathoppe scheme Zone - V under HFA - PMAY (AHP) for TNUHDB.
11 Four Laning of Oddanchatram - Dharapuram - Avinashipalayam Section of SH-37 ("Tamilnadu State Highway") from Km 37+400 to Km 108+400 in the State of Tamil Nadu under TNRSP-II to be executed on Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) on Modified Annuity Basis for Tamilnadu Road Sector Project.
12 Construction of Flood Protection wall, Chain link fencing and improvements to Coovum Canal of Chennai City Under JNNURM Scheme for Tamil Nadu Water Resource Department.
13 Construction of Houses for 166 Nos. of DSP, 1190 Nos. of SI/INS and 1317 Nos. of PC/HC and equivalent level to the personnel of police, Fire & Rescue Service and Prison Department under 'Own Your House Scheme' at Melakkottaiyur in Kancheepuram District for Tamil Nadu Police Housing Corporation Limited.
14 Creation of electrical infrastructure by extending 11KV HT lines, erection of 25KVA BEE 3 Star Rated Distribution Transformers and extension of 3 phase 4 wire LT line for Unauthorized IP sets in Ranebennur and Haveri District of Karnataka for Hubli Electricity Supply Company Limited
15 Remodeling of Primary & Secondary Storm Water Drains, Culverts/Bridges & Allied Works (about 43 nos.) identified under "BBMP SWD Action Plan Works 2016-17" in Bengaluru for BBMP.
16 Construction of Affordable Housing 1 BHK 120 units, 2 BHK 600 units and 3 BHK 60 units at Sy. No.03 of Doddabanahalli of BidaralliHobli, Bangalore East Taluk, Bangalore on Lumpsum turnkey basis based on Tenderer's own Design (Phase-II) for Bangalore Development Authority.
17 Providing RCC Precast Inspection Chambers of Size 600 x 600 x 1000 mm, 650 x 750 x 1000 mm and 750 x 750 x 1000 mm in NadapraKempegowda Layout at Bangalore for Bangalore Development Authority.
18 Modernization of Tunga Anicut Canal Network System from km 0.00 to Km 34.00 including providing CC lining using paver and Improvement of Structures in Shivmoga Package 1 for Karnataka Neeraveri Nigam Limited.
19 Construction of 2 BHK Housing Project at Sy. No. 55/1 of Malagala (Nagarabhavi 8th Block) of Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore for Bangalore Development Authority.
20 Proposed construction of Housing Scheme at Sheik Roza in Gulbarga for Karnataka Housing Board.
21 Construction of Multi storey Residential housing units including infrastructures like Layout Electrification, Water Supply and Sanitation, Arboriculture, Roads, Drains, Culverts, Solar Lighting, Rain Water Harvesting, Re-charge pits, Lifts with DG back up, Compound wall with Entrance Gate, Guard Room, motor room, control room for electrical, Fire tank, water supply and Sanitation etc., including 2 years maintenance at bidders cost and 3 years Maintenance at the cost of beneficiaries etc., complete, in a Fixed Price - No Variation Contract at Muddayyana Palya in Bengaluru BBMP/BDA/BMRDA areas under "1 Lakh Multi-Storey Bengaluru Housing Programme" on Turn Key basis [Planning, Design, Build, Operate and Transfer] under Two [stage] Cover System Rajiv Gandhi Rural Housing Corporation Limited.
22 Construction of 1 BHK and 3 BHK Housing project at Sy .no .22,23 of Konadasapura village in Bidarahalli Hobli,Bangalore East taluk on lump sum Turnkey Basis on Tenderer's own Desing under Two Cover system ( Phase -1) for Bangalore Development Authority.
23 Re-modeling (Modernization) of Y-alignment from Km 15.727 to Km 21.175 & Tumkur branch canal (TBC) from Km 0.00 To Km 70.00 under Hemavathy Project on Item Rate Tender for CNNL.
24 Construction of 3 BHK and 2 BHK Housing Units at Sy. No. 115/1 & 115/2 of Kommaghatta village under Nadaprabhu Kempegowda Layout on Lump Sum Turnkey Basis at Phase I & II for Bangalore Development Authority.
25 Improvements to Yelahanka AP border road of SH-09 for Karnataka Road Development Corporation Limited.
26 Providing electrical infrastructure to regularized Un authorized IP sets on Total Turnkey basis under Rate contract for a period of TWO years in Chitradurga & Davanagere Division for BESCOM.
27 Planning, Designing and Construction of Flat Type-High Rise Buildings cum Commercial units including on site development with all Infrastructure Services for Economical Weaker Section (EWS) scheme at Belavali, Badlapur for 2298 Housing units (EWS) for KBMC.
28 Providing electrical distribution network with distribution transformers 11KV & LT Cables for the entire layout and also for establishing 3X31.5 MVA,66/11KV Substation at Sampigehalli village Sy no.31 & 32 in Arkavathy layout in Bangalore for Bangalore Development Authority.
29 Construction 1000 Multi Storied Residential Flats by utilizing maximum FSI under EPC system at Sholinganallur village, Kancheepuram District, Tamil Nadu State for Tamil Nadu Housing Board.
30 Formation of new reservoir near Kannankottai and Thervaikandigai Village in Gummidipoondi Taluk of Thiruvallur District for Tamil Nadu Water Resource Department.
31 Construction of 150 Three BHK,220 Two BHK and 116 EWS Houses on design and build basis adjoining to pocket D-7 & D-8 at Vasant Kunj including internal as well as external development and electrification, UGR's, STP, ESS etc. of entire pocket (A Turnkey Project) for DDA.
32 KIIFB - CONSTRUCTION OF - 1) 21 nos.Groyne at Arattupuzha in bet.Ch.56.6 to 57.8 Km at Arattupuzha, 2) Groyne Between CESCP 645 and 672 (Ch 77.34 Km to Ch. 82.74 Km) at Ambalapuzha South, North anchayath and Punnapra South Panchayath, 3) 13 nos Groyne at Pathiyankara in bet.chainage 60.1 to 61.6 Km at Thrikkunnapuzha, 4) Groyne at Kattoor from Ch.168.465 Km TO CH 171.627 Km (Old CH 96.643 Km TO CH 9.535 Km), 5) 16 nos. Groyne at Vattachal in bet.Ch.53.4 to Ch.55.2 Km at Arattupuzha GP. for KIIFB.
33 Construction of 342 1228 MIG (B+S+1g Fioors in 2 Blocks) and 114 MIG (S+19 Floors in 1 Block)l Multistoried Residential Flats at Nerkundram phase-II Stage I scheme, in S.No.g76/2,37g etc., of Nerkundram Village, Maduravayal Taluk, Thiruvallur District under Self finance Scheme for TNHB.
34 Construction of 1183 MSB (Stilt+13 Floors) EWS Flats 2 Block in (Type 1, 2 Block in Type 3, 1 Block in Type4,1 Block in Type 2B) at Ernavoor, Chennai - Group-V. for TNHB.
35 Construction of 1040 MSB (Stilt+13 Floors) EWS Flats (2 Block in Type 5,1Block in Type 2, 2 Block in Type 4B) at Ernavoor, Chennai - Group-IV, TNHB.
36 Tender for the Construction of 1036 Nos. of PC/HC quarters with development works at Cochin House in Chennai City under Phase-X)V4800 quarters scheme or the year 2013-2014 Tamil Nadu Police Housing Department.
37 Modernisation of Tunga Anicut Canal Network system From Km 34.00 to Km 101.60 Km and distributaries from Dy.No. 26 to 62 (38 Nos.) Including providing c.c Lining using paver and Improvements to Structures of TLBC and From Km 26.00 to 53.80 Km and distributaries from Dy.No 22 to 38A (19) Including Providing C.C Lining using paver and Improvements Structures of TRBC(Package-2) for KNNL.
38 Execution of CAPEX works (Action plan works) and works under revenue budget under item wise fixed price contract in Chitradurga Division Area for a period of two years on total / partial turnkey basis (Distribution Transformers supplied by BESCOM) under percentage quoting on each item basis.
39 Construction of 4-Lane Bangalore-Chennai Expressway from Kancheepuram to Sriperumbudur Section in the State of Tamil Nadu under Bharatmala on Hybrid Annuity Mode.
40 KIIFB – CONSTRUCTION OF- 1. 21 nos. Groyne at Arattupuzha in bet.Ch. 56.6 to 57.8 Km at Arattupuzha, 2. Groyne Between CESCP 645 and 672 (Ch 77.34 km to Ch. 82.74 km) at Ambalapuzha South, North anchayath and Punnapra South Panchayath, 3. 13 nos Groyne at Pathiyankara in bet.chainage 60.1 to 61.6 KM at Thrikkunnapuzha, 4. Groyne at Kattoor from Ch.168.465KM TO CH 171.627KM (Old CH 96.643KM TO CH 9.535 KM), 5. 16 nos. Groyne at Vattachal in bet.Ch.53.4 to Ch.55.2 Km at Arattupuzha GP
41 KIIFB – FSH007-01- Chethy Fishing Harbour In Alappuzha District – Civil Works
42 Construction of 40 Three BHK with Servant room and 60 Two BHK Houses on design and build basis adjoining to Community Hall at Masoodpur section – B, Vasant Kunj including internal as well as external development and electrification UGR’s, STP, ESS etc., entire pocket (A Turnkey project).
43 Construction of 76 three BHK, 111 two BHK and 58 EWS houses on design and build basis adjoining to pocket D-6 at Vasant Kunj including internal as well as external development and electrification, UGR’s STP, ESS etc. of entire pocket (A Turnkey Project)”.
44 Construction of 150 Three BHK, 220 Two BHK and 116 EWS Houses on design and build basis adjoining to pocket D-7 & D-8 at Vasant Kunj including internal as well as external development and electrification, UGR’s, STP, ESS etc. of entire pocket (A Turnkey Project).
45 Establishment of Industrial Housing Facility (Dormitory) for employees of M/s. Foxconn Hon Hai Technology India Mega Development Private Limited at SIPCOT Industrial Park, VallamVadagal, Sriperumbudur Taluk, Kancheepuram District (Group-1).